High Tunnel

Hey everyone,

Just a quick post on the high tunnel here.  The local paper did a story on it when it was completed last fall.  Richard, Petey, and I all took an afternoon to put chicken wire on the inside of the hoophouse to keep unwanted animals from getting inside while the sides are down.

Hoophouse1

The high tunnel is a season extender that allows us to grow crops in a more controlled environment.  The state of Missouri granted us $7,000 to build the high tunnel.  We have plans to build more, with grants if possible.

Leave a Reply

Your email address will not be published. Required fields are marked *